Technical Office Manager-
B.Sc in Civil Engineering, (Faculty of Engineering, Ain- Shams University) Cairo, Egypt. 1980.
I have worked for the following Companies in
Egypt: Speco, National Company for Housing, Orascom /CCC joint venture
BELFOUR BETTY/ARAB CONTRACTORS.
Saudi Arabia: SAUDI LETCO, ALMAJAL Company, Saudi Company for
Development and commerce, SAUDI BIN LADEN GROUP.
Introduction to bolted connections, the difference between low carbon steel and high tensile steel bolts, the different components of a bolt, categories of High- strength bolts, learn about snug-tight bolt
Two solved problems for practice, the first solved problem is for the inertia of a given rectangular section, it is required to estimate Ix&Iy,kx, and Ky.
The post includes solved problems for P-F Value. The first problem 3.5 includes h how to get F in terms of P,t, and i%? another problem is also included.
Solved problem 4-7, this a design problem for which lb>lr, the solution is made by using a design chart, table3-10, a discussion about the use of table 3-2, and why is table 3-10 is better in that case.
A solved problem-8 by modified newton Raphson Method. A step-by-step guide comparison is made between the newton method and the modified Newton Raphson method.